Monday, June 6, 2011
Hiatus is over.
I feel like a lot has happened in the past (almost) month, and yet I don't really remember what. I need to go through what pictures we do have and get some updates going. Something to look forward to.
In the meantime, we have a super fun summer planned and I cannot wait! A baby shower this weekend for Baby Jones, a vacation to the Dells to celebrate my parent's 40th wedding anniversary later this month, swimming in the pool with Ellie (which reminds me I need to see if we can still sign up for swimming lessons in August), Baby Jones' arrival in July, the State Fair in August and then we are already into fall! And getting the house ready to put on the market. Busy, busy, busy. I cannot wait!
Sunday, August 22, 2010
It is finally done.
Two months after we built it, the shed is finally painted and compete. It is a lot taller than our old one, which gives Nick more room for hanging things (and it has a loft area). Nick must like it, because after Eleanor goes to bed he likes to spend time working on his bikes in the shed. Good think it is getting used!
Monday, May 17, 2010
The Bike House
So… NICK’S BIKES GOT A NEW HOUSE! Although the base size equates to the same number of square feet, we did gain some head space (and a loft) with the new shed, which I am sure we can put to use in one way or another. Two weeks ago we (mainly Nick) undertook the fun task of tearing down the shed in the backyard. Then this past weekend we started putting up the new shed.
First, a BIG thanks to Eleanor’s Godparents, Mike and Megan, for watching her all day Saturday so both Nick and I could focus on the building without having to take time outs to take care of a little one.
Second, I cannot believe that Nick and I put up the shed with just the two of us. Mainly, I cannot believe that I could help enough (or Nick could make up for what I was lacking in ‘man’ strength) to achieve some of the feats we did.
Third, another BIG thanks to Nick’s step-father, Jeff, for lending us some very useful tools to make the project go a lot faster. For anyone that thinks they can put up a shed without an air nailer and just a hammer and regular nails- you are crazy! Here are a few pictures of the not so fun venture.
Thursday, September 4, 2008
Spare Bedroom #1: AKA The Dog's Room
Thursday, August 28, 2008
The Living Room
After
Onto the next room- the living room/hallway. We don’t have a picture of the hallway yet, but we will work on that. In the living room we changed out the ceiling fan/light fixture in the main room and above the entry way. We were tired of the old 70’s looking waffle fans and decided and upgrade was due. We painted all the walls, ceiling, and put in new carpet, as well as vinyl in the entryway. We also changed out the window covering over the big window and added wall decorations. The one you can see is a collage of pictures we took on our honeymoon, an everyday reminder of the fun we had in Antigua. This room wasn’t bad to do, although the light fixture over the entry way was not the most fun- that is how we spent our 4th of July weekend.
Wednesday, August 27, 2008
The Bathroom
After Tuesday, August 26, 2008
The Improved House!
Wednesday, August 20, 2008
Let’s Dig- AGAIN!
The hole they dug to access the sewer line. If you look closely you can see one of the holes in the line.Also, Lowes came out and did some touch up work on the house so it looks better as well! Now we just have to get everything put away and the baseboard in.
With that big of a root growing in the line we are not sure how anything passed through!
Friday, August 15, 2008
Lowes Professionals- are you sure???
Could this lack of care and professionalism be a result of having a drink while working? Maybe- because we found a beer can in the just emptied garbage as well (along with an energy drink container that matched another energy drink container found in the house). And while they deny the drinking on the job- I think it is a HUGE coincidence that a beer can ended up in our garbage on the same day they were working on the house (and it isn’t a beer Nick or I would drink, nor have we noticed our neighbors walking down the street with a beer and then choosing our garbage to put it in). They were also kind enough to consider us their ‘mothers’ and leave their lunch/snack wrappers around the house.
In additional, the ONE room we asked them to do on the first day didn’t get done and they did other rooms instead (which meant moving everything we had cleared out of one room back into the room before laying the carpet). I have already made a call to Lowes (who contracts the installers) and we will see how much gets fixed. They claim to have guaranteed satisfaction and they have not achieved that yet.
Our recommendation- stay away from Lowes ‘professional’ installers because in our opinion they are not worth the hassle no matter how inexpensive they are.
On the positive note, the flooring is now in and we can try to get back to normal. Once we get things reorganized we will post pictures (maybe as early as tonight)! We also hope to add a few pictures of Nick attempting to play Wii Fit in the newly remodeled basement.
Monday, August 4, 2008
The drywall is up and we're ready for texture!
Friday, August 1, 2008
Work continues on the basement
Here is what the basement looks like today:
Tuesday, July 29, 2008
More than what we anticipated
Tuesday, July 1, 2008
Another weekend, another project.
Next up... new ceiling fans, cabinet hardware and painting the doors. Then back to the basement again. Now this is what we call the honeymoon period.
Tuesday, June 17, 2008
The Painting Continues...
The living room/entryway/hallway are now painted a nice shade of dark tan! Nick and I spent a good portion of the weekend cleaning the walls, painting and painting another coat. I must say, the new color makes a huge difference in how the space looks, and I am very happy with the result. It also means we get to put stuff up on the wall and get rid of the ’70 window shades, which helps make the place feel like a home verses just a house I live in.
The other fun news is that there are only two more ‘whole’ rooms we have left to paint! They are both fairly small and I have already told Nick I would do the bedroom on my own (once we get all of the basement ‘extras’ out of it and back in the basement)! After that, we have the basement to fix up again and hopefully re-carpet the upstairs. Then we can sit back and relax for once. It is much needed since we started this home improvement kick a year ago with the deck and some outside work. More updates to come soon (and hopefully the end of the home improvements for a while.)




